• 0

Project Consultancy, Reports & Profiles

Reasons why should start a Business in Swaziland:

Swaziland is one of just two African countries with investment-grade credit ratings. The country is also remarkably devoid of the majority of the major political and economic issues that plague other African countries. The government upholds the rule of law and democratic principles set forth in the constitution. Swaziland has made progress in enhancing governance openness and accountability.

Transparency International's Corruption Perceptions Index placed it 30th out of 178 nations surveyed (tied with Austria). It is classified as a free market economy. Furthermore, in terms of income per capita, it is among the top 20% of African countries.

 

What are the Natural Resources in Swaziland?

Mining, agriculture, and forestry together contribute for 17% of GDP. Titanium ore is the most important mineral resource, accounting for more than 40% of exports. Iron ore (38%) is the most abundant mineral, followed by gold (15%) and coal (15%). (6 percent). Agriculture is an important part of the food sector in rural areas. It accounts for almost a quarter of the country's GDP. Commercial crops include maize, sugar cane, cotton, and rice.

Irrigation has the ability to improve production. Forestry produces wood products, which contribute for 15% of total export revenue. Livestock, dairy products, and fish are examples of other agricultural products. Textiles, clothes, leather items, and footwear are all produced by industries. These industries are primarily manufacturing, yet they account for 30% of all exports.

 

What are the Business Opportunities in Swaziland?

Agriculture, mining and quarrying, food and drinks, chemical and pharmaceutical products (except pharmaceuticals), chemical products (including drugs), non-metallic mineral products, basic metals, and fabricated metal products are all part of the manufacturing sector. Manzoni/Mbabane (where textile manufacturing businesses have developed operations), Sitka (for processed agricultural produce), and Big Bend are the main industrial centers. Sugar processing, leather tanning, and footwear manufacturing are examples of smaller industries.

 

Is Swaziland good for Business?

Swaziland has well-developed economic centers. Swaziland, a country in southern Africa, is one of them. Its top exports are sugar, wood pulp, and wool. Swaziland, one of Africa's top economic destinations, has been working hard to attract investment and improve its image on the international stage.

It became a member of both SADC and COMESA (Southern African Development Community) (Common Market for Eastern & Southern Africa). Swaziland has witnessed economic development and is implementing a strategy.

Promoting reforms that are beneficial to trade and investment. The government and the World Bank concentrated their efforts on increasing private sector growth and attracting investment.

 

Business-Friendly Policies and Government Initiatives of Swaziland:

Swaziland is more business-friendly than it has ever been, with a slew of initiatives and regulations in place to make launching and maintaining a company easier than before. There are a number of government initiatives and other actions in place to help your business succeed. In addition, the Seed Capital Fund is a new programmer that aims to provide finance for businesses that are in need of capital.

These programmers have already been implemented and are supporting Swaziland's entrepreneurs in expanding their businesses. Apart from these benefits, there are a few restrictions in place to protect investors from some of the risks associated with investing.

 

Swaziland Industrial Infrastructure:

For its position in southern Africa, Swaziland boasts a well-developed infrastructure. Swaziland is served by four seaports as well as an airport at Mbabane. Swazi Railways also provides service throughout southern Africa and runs three train lines. Businesses may easily import and export items from their country's ports because to these assets. Freight service is available on branch lines.

Highways comprise 3,747 kilometers, of which 470 kilometers are paved and 3,277 kilometers are unpaved (2003). Beira, Mbabane-Mbuluzi River—ports and harbors There are ten airports in the city (as of 2007), two of which have paved runways. Swaziland has 12 landing strips as well.

 

What are the steps for Starting a Business in Swaziland?

In order to start a business in Swaziland, you must first register with your local government. This entails going to one of two offices – the Department of Trade and Industry or the Ministry of Labor and Social Security – or calling one of them. If you are renting space for your business, you will need documentation that you are at least 18 years old (such as an ID), proof that you are a Swaziland citizen or resident (your passport), and confirmation that you have authorization from your landlord.

You'll also need to supply information about your firm, such as its name, address, phone number, and who owns it, if you're beginning a new business. It takes about 3 weeks for your license to be approved after you have completed the registration process.

 

Market size of Swaziland:

Swaziland's economy is based on agriculture, forestry, and mining, which contribute for around 13% of GDP, while manufacturing (textiles and sugar-related processing) accounts for 37%. The remaining half of GDP is made up of services, with government services taking the lead. The Swazi economy is dual in nature, with high productivity in textile manufacture and in industrialized agriculture. High-value crops (sugar, forestry, and citrus) are characterized by high levels of investment and irrigation, as well as high production.

 

Industrial growth of Swaziland:

Swaziland is Africa's fourth largest sugar producer and the world's 25th largest producer. This reflects the industry's intense commitment on continuing to build its economy. Swaziland's GDP was $8.621 billion (US dollars), with sugarcane and sugar products accounting for the lion's share. Wood pulp and sugarcane were Swaziland's major exports until the wood pulp producer, according to the World CIA Fact book. Sugarcane production is the primary export.

The Royal Swaziland Sugar Corporation is the country's main sugar producer (RES Corporation). The European Union is Swaziland's and the larger Southern African Development Community's (SADC) main export partner. Swaziland's mineral sector is self-sufficient.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Setting up uPVC and CPVC Pipes Business
Setting up uPVC and CPVC Pipes Business

 

uPVC is an acronym for un-plasticized polyvinyl chloride. It is also known as r... Read More

Capacity :
CPVC Pipes 50 mm 4 MT Per Day uPVC Pipes 150 mm 8 MT Per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
414.00Lakhs
Add To Inquiry Basket
Fertilizers Manufacturing Handbook
Fertilizers Manufacturing Handbook

Starting a fertilizer manuf... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots

Zinc ingots... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing

One of the finest ways to get a professional paint finish is with <... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business

 

How do Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Curcumin Extraction Unit
A Business Plan For Curcumin Extraction Unit

 

Curcumin Extracti... Read More

Capacity :
15,000 Kgs Per Annum , 7,140 Kgs Per Annum , , 2,76,300 Kgs Per Annum
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
511.00Lakhs
Add To Inquiry Basket
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)

 

Indian culture has a very long history with sp... Read More

Capacity :
300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
44.00Lakhs
Add To Inquiry Basket
Setup Plant of Super Absorbent Polymer (SAP)
Setup Plant of Super Absorbent Polymer (SAP)

A superabsorbent polymer (SAP) is a type of polymer that has the ability to absorb an... Read More

Capacity :
Super Absorbent Polymer 8,000 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Setup Business of Nano Resin Modified Bulk Composite for Dental Application
Setup Business of Nano Resin Modified Bulk Composite for Dental Application

 

Nano Resin Modifi... Read More

Capacity :
Nano Resin Modified Bulk Composite 2,000 Pcs Per Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

 

Glass Fiber Reinforced Polymer (GFRP) rebar is an innovative construction material, engineered by embedding ... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day
Plant and Machinery cost:
211.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
549.00Lakhs
Add To Inquiry Basket
A Business Plan for Urea from Natural Gas
A Business Plan for Urea from Natural Gas

 

Capacity :
Urea Fertilizer 100 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3300.00Lakhs
Add To Inquiry Basket
Start Production of Ferrotitanium Using Induction Furnace
Start Production of Ferrotitanium Using Induction Furnace

Ferrotitanium using induction furnace is a specialized process that involves the melting a... Read More

Capacity :
Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
1600.00Lakhs
Add To Inquiry Basket
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk

Biodegradable and edible tableware products represent a remarkable fusion of innovati... Read More

Capacity :
Biodegradable and Edibile Tableware Products (Plate, Bowl & Cups) 72,000 Pcs Per Day
Plant and Machinery cost:
341.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
583.00Lakhs
Add To Inquiry Basket
Start Business of Sorbitol
Start Business of Sorbitol

Sorbitol is a type of sugar alcohol that is widely used as a sweetener in various foo... Read More

Capacity :
Sorbitol 6 MT Per Day
Plant and Machinery cost:
431.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World

 

A solar panel is ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business of Medical Disposables Gowns and Drapes
Business of Medical Disposables Gowns and Drapes

 

Surgical gowns mu... Read More

Capacity :
Medical Gowns: 1,250 Pcs per Day Medical Drapes: 1,250 Pcs per Day
Plant and Machinery cost:
209.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.54%
Break Even Point (BEP):
55.16 %
TCI :
0.00 Lakhs
Cost of Project :
529.00Lakhs
Add To Inquiry Basket
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Your Own Production Business of Disposable Plastic Syringes Fastest Growing Industry of Medical Disposables
Setup Your Own Production Business of Disposable Plastic Syringes Fastest Growing Industry of Medical Disposables

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Demanding Business of E-Rickshaw Assembling
Demanding Business of E-Rickshaw Assembling

E Rickshaws are three wheel ... Read More

Capacity :
200 Nos per day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
2580.00Lakhs
Add To Inquiry Basket
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are t... Read More

Capacity :
150 Nos per day
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
708.00Lakhs
Add To Inquiry Basket
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry

Production of Azithromycin, Cefixi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient

Production of Ciprofloxacin Hydrochloride (CIPRO) - Active ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Startup Opportunities in Active Pharma Ingredients
Startup Opportunities in Active Pharma Ingredients

 

Startup Opportunities in Active Pharma Ing... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

Active pharmaceutical ingredients are the active substances that are used in the manufacture of a drug and have ... Read More

Capacity :
Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are those that can be recharged. Lithium batteries are now powering a wide range of electrical a... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos./Day
Plant and Machinery cost:
503.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1382.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2,gas at O0/1 matm. 1.429 g./l, crit. pressure, 49.7 matm.) is a colorless, odourless, an... Read More

Capacity :
Oxygen Gas: 667,800 Cu.mtrs per annum Nitrogen Gas: 2,480,400 Cu.mtrs per annum
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
643.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack: 16,800 Nos per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1381.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs ar... Read More

Capacity :
50 Nos./day
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling Business
Hybrid Electric Scooter Assembling Business

Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Naphthalene from Coal Tar & Petroleum Waste
Naphthalene from Coal Tar & Petroleum Waste

Naphthalene is an organic compound with formula C10H8. It is the simplest polycyclic aromatic hydrocarbon, and is a wh... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos/day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1076.00Lakhs
Add To Inquiry Basket
E-Rickshaw
E-Rickshaw

Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, t... Read More

Capacity :
1,200 Nos per Annum
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
E-Rickshaw (Electric tuk-tuks) Manufacturing Business
E-Rickshaw (Electric tuk-tuks) Manufacturing Business

E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource... Read More
Capacity :
3000000 Ltrs. /Annum
Plant and Machinery cost:
24.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
62.00 %
TCI :
112.00 Lakhs
Cost of Project :
112.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and new... Read More

Capacity :
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
39.00 %
TCI :
595.00 Lakhs
Cost of Project :
595.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water With PET Bottles
Packaged Drinking Water With PET Bottles
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a mo... Read More
Capacity :
40000 Ltrs./Day
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
171.00 Lakhs
Cost of Project :
171.00Lakhs
Add To Inquiry Basket
COAL BASED POWER PLANT (500 MW)
COAL BASED POWER PLANT (500 MW)

Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and... Read More

Capacity :
500 MW
Plant and Machinery cost:
143200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.00%
Break Even Point (BEP):
25.00 %
TCI :
158700.00 Lakhs
Cost of Project :
158700.00Lakhs
Add To Inquiry Basket
FUEL BRIQUETTES FROM BIOMASS (Bio Coal Briquettes from Agricultural Cellulosic Waste)
FUEL BRIQUETTES FROM BIOMASS (Bio Coal Briquettes from Agricultural Cellulosic Waste)

Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly an... Read More

Capacity :
4800 MT/Annum
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
129.00 Lakhs
Cost of Project :
129.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
3000000 Bottles/Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
52.00 %
TCI :
108.00 Lakhs
Cost of Project :
108.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
0
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
54.00 %
TCI :
100.00 Lakhs
Cost of Project :
100.00Lakhs
Add To Inquiry Basket
WOODEN FURNITURE
WOODEN FURNITURE

Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables... Read More

Capacity :
7500 Pcs./Annum
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
118.00 Lakhs
Cost of Project :
118.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS

Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices... Read More

Capacity :
3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
923.00 Lakhs
Cost of Project :
923.00Lakhs
Add To Inquiry Basket
Rickshaw Cycle Tyre & Tubes
Rickshaw Cycle Tyre & Tubes

Rickshaw/Cycle Tyre & Tubes

Bicycle and rickshaw tyres & tubes are the bac... Read More

Capacity :
Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
570.00 Lakhs
Cost of Project :
570.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water & Pet Bottle
Packaged Drinking Water & Pet Bottle

-

Read More
Capacity :
7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backi... Read More

Capacity :
0
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
54.00 %
TCI :
125.00 Lakhs
Cost of Project :
125.00Lakhs
Add To Inquiry Basket
WOODEN DOORS AND FRAMES
WOODEN DOORS AND FRAMES

Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such ... Read More

Capacity :
80 Pcs./day
Plant and Machinery cost:
10.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
42.00 %
TCI :
93.00 Lakhs
Cost of Project :
93.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity :
1440 Cubie Meter/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
18.00
Rate of Return (ROR):
18.19%
Break Even Point (BEP):
75.00 %
TCI :
101.00 Lakhs
Cost of Project :
101.00Lakhs
Add To Inquiry Basket
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)

The various sizes and type of match boxes are largely used in all the homes commercial section shops and industries. The Match phosphorus coating l... Read More

Capacity :
1500 Lacs/Annum
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
43.00 %
TCI :
213.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Rolls & Facial Tissue
Paper Napkins, Toilet Rolls & Facial Tissue

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world with out a printed books and news... Read More

Capacity :
1000 Kgs/Day
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
38.00
Rate of Return (ROR):
96.61%
Break Even Point (BEP):
25.40 %
TCI :
53.00 Lakhs
Cost of Project :
53.00Lakhs
Add To Inquiry Basket
Charcoal From Bagasse
Charcoal From Bagasse

Bagasse is one of the major by product of sugar crushing industries. Charcoal is a highly porous form of amorphous carbon. It is one of the half b... Read More

Capacity :
2.0 MT/Day
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
25.00
Rate of Return (ROR):
26.41%
Break Even Point (BEP):
62.20 %
TCI :
154.00 Lakhs
Cost of Project :
154.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity :
Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost:
413.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
A Business Plan for Wood ... Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum 27.00 790.00
Start a Production Of Sod... Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum 14.00 1265.00
12345678910...

Showing 361 - 420 of 610 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR